SOT: Co-alignment East Limb
2010-05-09T20:25:00 to 2010-05-09T22:09:35
Science Goal: Co-alignment East Limb
Program: East Limb coalignment, G-band only
Target: Alignment
xcen=-945 ycen=0
Instrument: SOT
HOP/JOP: 0
Description:
Hinode 3-instrument co-alignment program
Co-alignment program run: Please run co-alignment program on May 9 or 10 for the three instruments. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 2 hours for N-limb at 945 arcsec and 2 hours for E limb at -945 arcsec. - Not necessary to be during SAA-free time. - For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run. - For XRT, please take data even during SAA and twilight periods. - For SOT, please use CTM HYTHERISIS (not CT RUM) at the start of each program - For EIS, please run Imada's new co-alignment program