TRACE Instrument EMC Test Notes After completion of the "ion" procedure, the following procedures are required to run EMC tests: List of procedures (/tsw/cfl/IandT/src): TRACE S/C TEST NUMBER ---- -- ---------- --------------------- 1. init_emi RE02, RE04, RS03 2. start_emisus_test RE03 3. start_emi_s2 RE03 4. dump_emisus RE03 5. (emi_s_3) RE03 6. stop_emisus_test @ completion of RE03 7. stop_emi_s2 8. stop_emisus 9. start_emiemm_test RE02, RE04 10. start_emi_e2 RE02, RE04 11. start_emiemm RE02, RE04 12. (emi_e_3) RE02, RE04 13. stop_emiemm_test @ completion of RE02 14. stop_emi_s2 and RE04 15. stop_emiemm Microprocessor Load Files (/tsw/cfl/IandT/loads): -------------- ---- ----- 1. emirad.cld 2. emisus.cld 3. fdb08.cld 4. pzt.cld To run the EMC-Suseptibility test, RE03 -- --- --- ----------------- ---- ---- 1. execute the start_emisus_test" procedure. This procedure will setup the decontamination heater duty cycle and initiate a sequence to take images every 5 seconds. 2. Periodically, during the test, execute the "dump_emisus" procedure. This dumps a test pattern and memory self test data to the chronological buffer. 3. If desired, execute the procedure "emi_s_3" to cycle the ops heaters. This procedure remains active until 'GOTO OUT' is sent by the TC The dump_emisus procedure can be run during this period, however care must be take to start this proc at a point during "emi_s_3" when the heater is OFF (there is a 25 second wait prior to repeating the loop and turning the heater back on). 3. At the end of test, execute the procedure, stop_emisus_test. This will power off the decontamination heaters, stop the sequence and downlink the data. To run the EMC-emmissions test, RE02, RE04 -- --- --- ------------------------------- 1. Execute the "start_emiemm_test" procedure. This procedure will setup the decontamination heater duty cycle and initiate a sequence to take images every 5 seconds. 2. If desired, execute the emi_e_3 procedure. This runs the ops heaters. This procedure will remain active until 'GOTO OUT' is sent by the TC. 3. At the end of test, execute the procedure, stop_emiemm_test. This will power off the decontamination heaters and stops the sequence.